When Is Rust Force Wipe
63,686 playing now

Offline80.221.91.195:28015checked 11d ago

MS Project | SOLO/DUO

moddedcarbon
Players now 0/ 25 0% full
7-day average 0 peak –
Rank #15,948 top 70%
Last wipe 17d ago no schedule published
Next wipe – too few wipes seen yet

Players

No hourly history yet.

Hourly average and peak, UTC.

Server performance

This server has not answered a direct query in the last 48 hours.

48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.

Rank

daily · 1 is best
RankRank in region
15k10k15k20k20 Sep24 Sep28 Sep1 Oct5 Oct9 Oct

Top 70% of all ranked servers. Ranked on player hours over the last seven days.

Wipe schedule

too few wipes seen yet

Not enough wipes seen yet to tell when the next one is. Every server wipes at the monthly force wipe.

Usual gap 8.5 days between real wipes
Wipe-day peak 1 players, last three wipes
Crowd held 0% else halves by day 1

The first 48 hours of its last wipes

Sat 26 SepThu 17 Sep
00.250.50.751+0h+9h+19h+28h+38h+47h

Players each hour, from the hour of the wipe. The latest peaked at 1, 0 hours in.

Wipes

newest first
WipedPeakCrowdLastedPlayers before
Sat 26 Sep, 09:07 UTC17d ago 1 – running 1
Thu 17 Sep, 20:03 UTC26d ago 1 halved by day 1 8.5 days 0

Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.

Similar servers

the same kind of game, then region, group limit, rate and wipes
ShockRust | Blue | NoLimitno group limit · 128 on average 42/ 300
RETRO RUST #1 Х1000|NOLIMIT|LOOT++|KIT WIPE 13.10EU · groups of 16+ · weekly · 108 on average 77/ 245
МИНИ-КАРТА 2Х | STORM | FPS+ 10.10EU · groups of 8+ · weekly · 90 on average 89/ 100
404 RUST 2Х|ДЛЯ НОВИЧКОВ|РУССКИЙ 10.10EU · groups of 16+ · monthly · 85 on average 33/ 1000
404 RUST 2Х|ДЛЯ НОВИЧКОВ|РОССИЯ 08.10EU · groups of 16+ · monthly · 76 on average 12/ 1000
404 RUST 2Х|ДЛЯ НОВИЧКОВ|EU MAIN 11.10EU · groups of 16+ · monthly · 74 on average 53/ 700

Quick answers

from the figures on this page

Rules and settings

What are the rules and settings on MS Project | SOLO/DUO?

The name of MS Project | SOLO/DUO gives no gather rate. The game's default group cap of 8 players applies. survival is the game mode, the normal game, with gather, build and raid. Fighting and raiding between players are allowed. The server browser lists it under Modded: plugins or settings alter the game. The plugin count is Carbon. VAC, Valve's anti-cheat, is enabled.

What is the map for MS Project | SOLO/DUO?

MS Project | SOLO/DUO uses a procedural map of size 3,500 with seed 789936933, generated by the game. The same size and seed produce the same map, so RustMaps can show it from this page.

Player stats

How populated is MS Project | SOLO/DUO?

MS Project | SOLO/DUO is not online at present; the last time it was seen was 11 days 1 hours ago.

Where does MS Project | SOLO/DUO stand in the rankings of Rust servers?

Over the last seven days, MS Project | SOLO/DUO ranks #15,948 for player hours, placing it in the top 70% of all ranked servers.

Server tags

How should you interpret the tags on MS Project | SOLO/DUO?

These tags are set by MS Project | SOLO/DUO and read by the game's server browser: gmrust (Game mode): Standard survival gameplay; mp25 (Max players): The slot count is 25; ts8 (Group limit): Teams are capped at 8, as in the standard game; v2633 (Protocol): Your game version must match protocol 2633 to connect; cs162929 (Build): It runs on game build 162929; ptrak (Networking): It uses RakNet, the standard network layer for Rust; $r? (Region code): No region code is set; ^z (Modded): You will find it under Modded; the game is changed by plugins or settings; ^y (Carbon): Carbon is the plugin framework used. The top of this page also shows its current players, queue, and world creation time, all from the tags.

Where does MS Project | SOLO/DUO appear in When Is Rust Force Wipe lists and filters?

These When Is Rust Force Wipe lists include MS Project | SOLO/DUO: Rust modded servers, listed live. These filters show it on the server list: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more.

Server details

Where can MS Project | SOLO/DUO be found?

There is no region published by MS Project | SOLO/DUO. What you see on When Is Rust Force Wipe is the server's own location claim; the machine's real spot is not looked up. You can reach it at 80.221.91.195:28015.

How stable is MS Project | SOLO/DUO, and is it online now?

The last time MS Project | SOLO/DUO was seen was 11 days 1 hours ago; it is offline right now. It was up for 0 of the last 7 full days' 168 hours, 0% of the time. First seen by When Is Rust Force Wipe on 13 September 2026.

Which Rust version is used on MS Project | SOLO/DUO?

On Linux, MS Project | SOLO/DUO runs Rust network protocol 2633 and build 162929. Joining requires the same protocol on your game; Steam updates it for you.

Wipe info

When does MS Project | SOLO/DUO wipe?

Its rhythm cannot be told from the wipes of MS Project | SOLO/DUO on record, which are too few. The monthly force wipe, next on Thursday 5 November at 19:00 UTC, wipes every Rust server. It has been running its current world since 17 days 12 hours ago.

What happens on wipe day for MS Project | SOLO/DUO?

An average of 1 players turned out at the busiest point of its recent wipes. 0 hours after the latest wipe, the crowd peaked. Until the next wipe, the crowd stayed above half that peak in 0% of recent wipes. In the other cases, the crowd dropped below half by day 1.

How to join

How can you connect to MS Project | SOLO/DUO?

Enter client.connect 80.221.91.195:28015 after pressing F1 to open the console in Rust. Or use Launch Rust here to open Rust through Steam and connect.

Server tags

what each one means

Published as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y

Game

gmrust
Game mode Standard survival gameplay.
mp25
Max players The slot count is 25.
ts8
Group limit Teams are capped at 8, as in the standard game.
v2633
Protocol Your game version must match protocol 2633 to connect.
cs162929
Build It runs on game build 162929.
ptrak
Networking It uses RakNet, the standard network layer for Rust.
$r?
Region code No region code is set.

Mods and access

^z
Modded You will find it under Modded; the game is changed by plugins or settings.
^y
Carbon Carbon is the plugin framework used.

Players now (cp), the queue (qp) and the wipe time (born) are in the tag string too; they change every few minutes and are shown at the top of the page. Flag meanings are Facepunch's.